VSP-G1 Quick Start Guide: Difference between revisions
From VSPARTICLE - Docs
						
						| m (K.groves moved page G1 Quick Start Guide to VSP-G1 Quick Start Guide) | No edit summary | ||
| Line 2: | Line 2: | ||
| ==  | == Standard Procedure == | ||
| '''''Pre spark procedure''''' | |||
| * System is leak tight | |||
| * An appropriate filter has been installed (HEPA or better) | |||
| * Overpressure protection is in place and functioning | |||
| * Check that all electrode connections are ok | |||
| * Make all the necessary modifications and settings <span style="background:#FFFF00">(confirm this is correct with Tobias)</span> | |||
| '''''Post spark procedure''''' | |||
| * Stop particle production | |||
| * Flush system (9x of the system volume) | |||
| * Close off gas source | |||
| * Contain the (to be) exposed area | |||
| '''''Retrieving the produced nanoparticles''''' | |||
| == Standard Configurations == | == Standard Configurations == | ||
Revision as of 13:26, 22 September 2016
This is the Quick Start Guide for standard operation of a G1 unit. For first time users, detailed information or trouble shooting, please refer to the User Manual.
Standard Procedure
Pre spark procedure
- System is leak tight
- An appropriate filter has been installed (HEPA or better)
- Overpressure protection is in place and functioning
- Check that all electrode connections are ok
- Make all the necessary modifications and settings (confirm this is correct with Tobias)
Post spark procedure
- Stop particle production
- Flush system (9x of the system volume)
- Close off gas source
- Contain the (to be) exposed area
Retrieving the produced nanoparticles

